Loading Events

« All Events

SVE Engineering Days!

December 19 - December 20

Engineering Day(s)

December 19:
Students build their Egg Drop Prototype in class (groups of 4). Teachers will collect the prototypes and bring them to the egg drop the next day.

December 20: 
Testing Day- Egg Drop. All students will meet in the amphitheater. Prototypes will be tested during this time.

Details

Start:
December 19
End:
December 20